Skip to Main Content

Site Work

Maitland Road Grading & Low Water Crossing

Maitland Road Grading & Low Water Crossing
Type: Featured, Commercial, Structural
Maitland Road and Grading, Rapid City, SD

Project Description

The Maitland Road Grading & Low Water Crossing was completed in 2016 for the South Dakota Department of Transportation.  The project replaced two rusted out metal culverts with a new 12’ x 8’ precast concrete box culvert in False Bottom Creek.  The project also included grading work to realign Maitland Road.   


Mainline's crew that was assigned to our project were professional throughout the project and assured that the City's expectations were met and exceeded. In spite of numerous project challenges which included confined site conditions, groundwater/creek seepage, dep bore pits, large cobble to bore through and period of extreme cold weather, Mainline Contracting completed the project with quality workmanship, on time and on budget. 
 

Kyle Mathis, PE,

Las summer we had the experience of reconstruction on our street. Fortunately for the city, Mainline Construction and Complete Concrete made it as painless as possible. I hope the city continues to use these two fine companies often. 

Milton & Rhonda Wright,

Mainline Contracting made an outstanding effort to exceed compliance expectations for the installation of the drainage improvements, crossings and box culverts for the Back 9 holes at the Elkhorn Ridge Golf Course. The site compliance record at this time is outstanding and is clearly a result of good team effort. 

Mainline Contracting Inc did an excellent job working with the residents affected by the project and providing the resources required to overcome the harsh weather conditions. They kept a positive attitude and were able to meet the substantial completion date set for the project without sacrificing the quality or workmanship of the construction. 

Hiene Junge,

Request A Quote

Drop us a line to request a quote on your next project.